Architectural projecting:
• Exclusive development of outline decisions.
• Geological research and geodetic adjustment of district.
• Drawing up of the building passport.
• Drawing up of the architecturally-engineering project:
• Architectural drawings.
• Constructional drawings.
• Projecting of technical parameters.
• Ventilation, heat supplies, water supply, gas supply, an electrical supply, sewer systems and TV connections.
• Architect’s supervision.
Interior and exterior designing project:
• Exclusive development of outline decisions.
• The layout.
• Interior design visualization.
• Equipment design creation (projects of engineering communications).
• Designer's supervision.
• Decorating.
Construction and repair works:
• Estimating and work’s scheduling.
• Organization of the construction, beginning from ground works and finishing with final cleaning.
Furniture production:
• Measurement and developing of exclusive design (free of charge).
• Production and installation of multipurpose furniture and doors in public and private premises.
The building equipment:
• Equipment calculation under the project.
• Sale and rent of the equipment.
|
|